New Construction Studies

If you are in the design phase of a new building our Cost Segregation Specialists can consult during the design phase to make your project more "cost seg friendly".

We will review your plans and make recommendations that can impact your bottom line. Certain building components can be easily modified to qualify for shorter life treatment and accelerated depreciation.

If you are in the construction phase of a new construction project, Engineering Based Cost Segregation can help make the project more affordable. We can conduct an intial evaluation based on the estimated size and scope of the project and prepare a cost vs. benefit analysis that will layout the expected tax benefits and the fixed fees required to complete the study.

If you have completed construction of your new building a detailed Engineering Based Cost Segregation study can increase building cash flow by accelerating the depreciation of the building. Our Cost Segregation Specialists will visit the site and perform a detailed engineering report that will reclassify building components into the 5, 7, 15, and 39 year categories.

If you would like to take advantage of our free, no cost no obligation initial evaluation click here to complete our Request For Proposal form. We will conduct a preliminary evaluation and provide you with the results within 3 to 5 business days. The evaluation will detail the estimated benefit in your building(s) and our flat fee to complete the study. 

If you would rather talk to someone about your building or situation please feel free to contact us at 1.866.303.6695.

Or, to schedule a design consultation, please contact us at 1.866.303.6695.